| Apellido | NANCEL-PENARD |
| Nombre | PIERRE |
| ID | 8663821 |
"Su solicitud se enviará en seg. Por favor espere."
SUGERENCIAS
Nancel-Penard, Pierre Autor ID: 1759488 ver autor
Articulos ( 11 en total, se muestran 3 )
● A comparison of conventional and direct block scheduling methods for open pit mine production scheduling, 2015
● A direct block scheduling model considering operational space requirement for strategic open-pit mine production planning, 2023
● A heuristic approach for scheduling activities with 'OR'-precedence constraints at an underground mine, 2020
Afiliaciones ( 3 en total )
● Advanced Mining Technology Center
● Centro Avanzado de Tecnologia para la Mineria
● Universidad de Chile
Nancel-Penard, P. Autor ID: 3969097 ver autor
Articulos ( 1 en total )
● A procedure to generate optimized ramp designs using mathematical programming, 2019
Afiliaciones ( 2 en total )
● Advanced Mining Technology Center
● Centro Avanzado de Tecnologia para la Mineria
Nancel-Penard, Pierre Autor ID: 8369446 ver autor
Articulos ( 1 en total )
● A novel approach for the design of minimum-cost open-pit haulage network, 2025
Afiliaciones ( 2 en total )
● Centro Avanzado de Tecnologia para la Mineria
● Universidad de Chile
ÁREA DE TRABAJO
FIRMA SELECCIONADA COMO BASE
Nancel-Penard, Pierre Autor ID: 8663821 ver autor
Articulos ( 1 en total )
● Open-pit phase design considering operational constraints: Towards the generation of high adherence production planning policies, 2025
Afiliaciones ( 2 en total )
● Centro Avanzado de Tecnologia para la Mineria
● Universidad de Chile
FIRMAS SELECCIONADAS PARA AGRUPAR