Muestra métricas de impacto externas asociadas a la publicación. Para mayor detalle:
| Indexado |
|
||||
| DOI | 10.1179/1743285515Y.0000000018 | ||||
| Año | 2016 | ||||
| Tipo | artículo de investigación |
Citas Totales
Autores Afiliación Chile
Instituciones Chile
% Participación
Internacional
Autores
Afiliación Extranjera
Instituciones
Extranjeras
The Altonorte Smelter implemented a daily scheduling algorithm in 2013, which has now been generalised for all conventional copper smelters. It applies a combinatorial search, in which the possible converter feeding sequences are evaluated using a greedy heuristic; the daily schedule is then constructed using the heuristically optimal sequence. Depending on the mode of operation, the objective may be to maximise copper production, maximise profits or control concentrate stockpiles. This combinatorial greedy approach has been incorporated within discrete event simulations, which mimic hundreds of days of operation, hence analysing alternate modes of operation. Automated scheduling is fundamental to the scientific management of copper smelters, as scheduling parameters characterise the operational modes.
| Revista | ISSN |
|---|---|
| Transactions Of The Institutions Of Mining And Metallurgy, Section C: Mineral Processing And Extractive Metallurgy | 0371-9553 |
| Ord. | Autor | Género | Institución - País |
|---|---|---|---|
| 1 | Navarra, A. | - |
Universidad Católica del Norte - Chile
|