Muestra métricas de impacto externas asociadas a la publicación. Para mayor detalle:
| Indexado |
|
||||
| DOI | 10.1080/02646811.2017.1369278 | ||||
| Año | 2017 | ||||
| Tipo | artículo de investigación |
Citas Totales
Autores Afiliación Chile
Instituciones Chile
% Participación
Internacional
Autores
Afiliación Extranjera
Instituciones
Extranjeras
This article offers a general description of hydropower regulations in Chile wherein two sectors that are regulated separately come to meet each other: water (as a natural resource) and electric industry (as an activity). First, the characteristics for pursuing the activity are described together with the manner in which the hydropower plants perform their function as an energy source both in terms of implementation (setting up the plants) as well as in terms of operations (functioning as an energy source). Second, the legal schemes that serve as the institutional foundation and regulatory system for water and energy are laid out. Lastly, specific regulation applicable to developing hydropower is reviewed in terms of both hydroelectric power plant projects (their construction) as well as operations.
| Ord. | Autor | Género | Institución - País |
|---|---|---|---|
| 1 | Blanco, Alejandro Vergara | Hombre |
Pontificia Universidad Católica de Chile - Chile
|
| 2 | Rivera Bravo, Daniela | Mujer |
Pontificia Universidad Católica de Chile - Chile
|
| 2 | Bravo, Daniela Rivera | Mujer |
Pontificia Universidad Católica de Chile - Chile
|
| 3 | Sanz de Undurraga, Gerardo | Hombre |
Pontificia Universidad Católica de Chile - Chile
|
| 3 | De Undurraga, Gerardo Sanz | Hombre |
Pontificia Universidad Católica de Chile - Chile
|
| 4 | Canas Ortega, Esteban | Hombre | |
| 4 | Ortega, Esteban Cañas | Hombre |
| Agradecimiento |
|---|
| Thus, the establishment of administrative easements (through the mere ruling and refinement of a concession decree by the Ministry of Energy) is separated from their exercise (land use and compensation payments), which can likewise be voluntarily refined within the same administrative procedures that grant the definitive electricity concession or through subsequent legal measures and/or processing. |