The "hybrid" tunnel. An innovative solution for urban tunnel in soils. The case of Américo Vespucio Oriente AVO1, in Santiago de Chile
Indexado
Scopus SCOPUS_ID:85195447501
DOI 10.1201/9781003495505-30
Año 2024
Tipo

Citas Totales

Autores Afiliación Chile

Instituciones Chile

% Participación
Internacional

Autores
Afiliación Extranjera

Instituciones
Extranjeras


Abstract



The "Américo Vespucio Oriente" Concession (AVO 1) is part of ambitious program, promoted by the Chilean Ministry of Public Works, to close this Ring Road to highway standard in Santiago de Chile. The project integrates this 8,278 m highway with three lanes in each direction, of which 7,678 m are underground, in a dense urban area of the city. The underground works combines 3 main construction methods: SEM and NATM tunnel: La Pirámide and Mapocho Branch (2,100 + 415 m).Cut & Cover tunnel: 2,891 m in a pile trench with two subway platform levels. "Hybrid" tunnel: 2,687 m between Apoquindo and Tobalaba. The construction works began in November 2017 and its completion was done in July 2022, with a inal budget of 900 MUSD. Based on the set of conditioning factors, a highly innovative hybrid tunnel section solution was designed to the it the tunnel layout under an existing boulevard, as well as each of the seven existing connections with exit/enter branches. The hybrid tunnel enables two roads overlapped with three lanes each. Level -1 platform is resolved by means of a NATM tunnel, while Level -2 has been constructed as a conventional trench-type structure using 1.00x1.00 m handmade piles with different spacings and a minimum embedment of 3.5 m, which are braced at their head by a post-tensioned slab between both levels. The gap between piles is reinforced by means of a lining wall. The hybrid tunnel has crossed below two existing underground parkings as well as under metro line 1. For that purpose, an improvement using jet-grouting from the deepest parking level was done. The paper describes the main design facts as well as the experiences during its construction.

Métricas Externas



PlumX Altmetric Dimensions

Muestra métricas de impacto externas asociadas a la publicación. Para mayor detalle:

Disciplinas de Investigación



WOS
Sin Disciplinas
Scopus
Sin Disciplinas
SciELO
Sin Disciplinas

Muestra la distribución de disciplinas para esta publicación.

Publicaciones WoS (Ediciones: ISSHP, ISTP, AHCI, SSCI, SCI), Scopus, SciELO Chile.

Colaboración Institucional



Muestra la distribución de colaboración, tanto nacional como extranjera, generada en esta publicación.


Autores - Afiliación



Ord. Autor Género Institución - País
1 Galera, Jose Miguel - Subterra Ingeniería - España
2 de Cabo, Manuel - Subterra Ingeniería - España
Subterra Ingeniería Ltd. - Chile
3 Ibarra, Guillermo - Subterra Ingeniería Ltd. - Chile

Muestra la afiliación y género (detectado) para los co-autores de la publicación.

Financiamiento



Fuente
Sin Información

Muestra la fuente de financiamiento declarada en la publicación.

Agradecimientos



Agradecimiento
Sin Información

Muestra la fuente de financiamiento declarada en la publicación.