Muestra métricas de impacto externas asociadas a la publicación. Para mayor detalle:
| Indexado |
|
||||
| DOI | 10.1007/S12351-023-00759-9 | ||||
| Año | 2023 | ||||
| Tipo | artículo de investigación |
Citas Totales
Autores Afiliación Chile
Instituciones Chile
% Participación
Internacional
Autores
Afiliación Extranjera
Instituciones
Extranjeras
A mixed integer linear programming model is presented for personnel planning of ground handling crews at Santiago International Airport in Chile. The model generates employee shift rosters for an entire month assuming heterogeneous workers (to reflect different skills demanded at specific times) that satisfy various constraints relating to legal restrictions, personnel demand, worker welfare criteria (fair shift assignments, elimination of undesirable shift patterns), and pre-existing work group assignments for achieving task synergies. Solutions are generated using a commercial solver, standardizing the shift assignment process and improving both personnel availability and worker welfare by objective standards compared to previous manual method solutions.
| Ord. | Autor | Género | Institución - País |
|---|---|---|---|
| 1 | Cavada, Juan Pablo | Hombre |
Universidad de Chile - Chile
|
| 2 | CORTES-CARRILLO, CRISTIAN EDUARDO | Hombre |
Universidad de Chile - Chile
Instituto Sistemas Complejos de Ingeniería - Chile |
| 3 | Henriquez, Gustavo | Hombre |
Universidad de Chile - Chile
|
| 4 | REY-SOSA, PABLO ANDRES | Hombre |
Universidad Tecnológica Metropolitana - Chile
|
| Fuente |
|---|
| Instituto de Sistemas Complejos de Ingeniería |
| ANID/FONDECYT/REGULAR |
| Complex Engineering Systems Institute ANID PIA/PUENTE |
| Agradecimiento |
|---|
| The authors want to acknowledge the support of project ANID/FONDECYT/REGULAR 1191200 and the Complex Engineering Systems Institute ANID PIA/PUENTE AFB220003. |
| The authors want to acknowledge the support of project ANID/FONDECYT/REGULAR 1191200 and the Complex Engineering Systems Institute ANID PIA/PUENTE AFB220003. |