This chapter explores key aspects of integrated project design using the extreme collaboration methodology, which enables the construction of BIM models that integrate architecture, structures, and MEP, using a “war room” or “information room” (i-room) where various project specialists interact in real time. To achieve the highest degree of integration within a project, the BIM model is then sent to a robotic arm that through additive manufacturing techniques, prints concrete elements previously designed in the i-room—in short, total machine–machine integration (BIM-robot).
| Ord. | Autor | Género | Institución - País |
|---|---|---|---|
| 1 | FORCAEL-DURAN, ERIC | Hombre |
Universidad del Bío Bío - Chile
|
| 2 | Garcia-Alvarado, Rodrigo | Hombre |
Universidad del Bío Bío - Chile
|
| 3 | Soto-Munoz, Jaime | Hombre |
Universidad del Bío Bío - Chile
|
| 4 | Pulido-Arcas, Jesús Alberto | Hombre |
The University of Tokyo - Japón
|