Colección SciELO Chile

Departamento Gestión de Conocimiento, Monitoreo y Prospección
Consultas o comentarios: productividad@anid.cl
Búsqueda Publicación
Búsqueda por Tema Título, Abstract y Keywords



Eight-dimensional planning - Construction of an integrated model for mine planning involving constructability
Indexado
Scopus SCOPUS_ID:84866723865
DOI
Año 2011
Tipo

Citas Totales

Autores Afiliación Chile

Instituciones Chile

% Participación
Internacional

Autores
Afiliación Extranjera

Instituciones
Extranjeras


Abstract



A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently there are some adverse effects, such as not capturing the real value of a project by not taking into account the construction of several underground drifts and general infrastructure. Then the common practice is to compute mining sequence and cut-off grade profiles over the life of the mine without constitutively integrating the development schedule as a means to measure the constructability of a given mine design and sequence. Thus, the investigation summarised in this paper shows a novel, integrative way of treating an underground mine sequence and production schedule while considering drift development scheduling. Moreover, it is thought that, because of this original model, the whole underground production scheduling exercise must concentrate on combining the development and the production scheduling to compute a robust and a feasible production schedule. In order to quantify the effect of the conventional way of viewing the planning, the concept of the building information model (BIM) needs to be used, which was postulated by Charles Eastman and has been used extensively since the late 1970s. BIM takes other aspects of a project into account, considering at the same time the spatial relationships, quantities and properties of building components, but especially some kind of model visualisation, which is the advantage to be incorporated. This paper presents the basis for an optimisation model that allows for defining the sequence of the mining development so that the production plan can be achieved. For this, the model considers the space dimensions, time, pattern or strategy, cost or benefit, precedence and resources available. Tests were performed considering a block caving and sublevel open stoping method. Finally these tests showed the main conclusion, that production sequence changes when the building capacity is considered.

Disciplinas de Investigación



WOS
Sin Disciplinas
Scopus
Sin Disciplinas
SciELO
Sin Disciplinas

Muestra la distribución de disciplinas para esta publicación.

Publicaciones WoS (Ediciones: ISSHP, ISTP, AHCI, SSCI, SCI), Scopus, SciELO Chile.

Colaboración Institucional



Muestra la distribución de colaboración, tanto nacional como extranjera, generada en esta publicación.


Autores - Afiliación



Ord. Autor Género Institución - País
1 Rocher, W. - Advanced Mining Technology Center - Chile
2 Rubio, E. - Advanced Mining Technology Center - Chile
3 Morales, N. - Advanced Mining Technology Center - Chile

Muestra la afiliación y género (detectado) para los co-autores de la publicación.

Financiamiento



Fuente
Sin Información

Muestra la fuente de financiamiento declarada en la publicación.

Agradecimientos



Agradecimiento
Sin Información

Muestra la fuente de financiamiento declarada en la publicación.