Impact of rom PSD on the crushing and grinding circuit throughput
Indexado
Scopus SCOPUS_ID:84942241942
DOI
Año 2015
Tipo

Citas Totales

Autores Afiliación Chile

Instituciones Chile

% Participación
Internacional

Autores
Afiliación Extranjera

Instituciones
Extranjeras


Abstract



Mathematical modeling in conjunction with mineral characterization is widely used as a method for design and optimization of comminution circuits, to simulate the processes of crushing, grinding and classification. An important input parameter to the simulation models is the Run-of-Mine Particle Size Distribution (ROM PSD). The run-of-mine size distributions due to blasting have a great influence on the performance of a semi-autogenous grinding (SAG) mill. In this paper, a mine case study was conducted where there are four primary geologic units and the material properties between the four units vary considerably. Also, the mixture of the four unit that will be mined at any given time also vary considerably. This presents a challenge in terms of optimizing the blasting for mill production throughout the mine life. As part of the case study, field rock mass characterization, laboratory rock mechanics tests, and laboratory breakage tests were conducted. The field characterization and rock mechanics tests provide material properties used to simulate the effect of different blast designs on run of mine particle size distributions (ROM PSD). The JKSimBlast software was used for these simulations. The rock breakage tests provide material properties used to simulate crushing and grinding performance. The JKSimMet software was used for these simulations. The goal of the mine is a mill throughput of 95,000 tonnes (104,720 tons) per day (TPD). Based on this goal, run-of-mine fragmentation analysis was conducted for four blasting designs resulting in powder factors of 0.44, 0.54, 0.64, and 0.94 kg/t. The powder factor of 0.44 represents a standard blasting design, while the 0.54 and 0.64 kg/t designs are high-energy blasts specifically to assist with mill production. The 0.94 kg/t design was investigated for the one geologic unit with very high strength. The results of the run-of-mine fragmentation analysis was then input into a crushing and grinding simulation model to predict the mill throughput for the time periods of 1-5 years and 6-10 years. The results indicate that certain blast designs are able to achieve the 95,000 tonnes TPD (104,720 tons TPD) goal, while other blast designs were not. A standard blast design with a 0.44 kg/t powder factor, for example, was not able to achieve the throughput goal, while a design with a 0.64 kg/t powder factor was able to achieve the goal in both the 1-5 and 5-10 year time periods.

Disciplinas de Investigación



WOS
Sin Disciplinas
Scopus
Sin Disciplinas
SciELO
Sin Disciplinas

Muestra la distribución de disciplinas para esta publicación.

Publicaciones WoS (Ediciones: ISSHP, ISTP, AHCI, SSCI, SCI), Scopus, SciELO Chile.

Colaboración Institucional



Muestra la distribución de colaboración, tanto nacional como extranjera, generada en esta publicación.


Autores - Afiliación



Ord. Autor Género Institución - País
1 Fernandez, F. - Split Engineering - Chile
2 Rocha, M. - Rocha Blast Engineers - España
Rocha Blast Engineers S.L. - España
3 Kemeny, J. - The University of Arizona - Estados Unidos
4 BoBo, T. - Split Engineering - Chile
5 Rodriguez, C. - Split Engineering - Chile
6 Fuentealba, R. - Split Engineering - Chile

Muestra la afiliación y género (detectado) para los co-autores de la publicación.

Financiamiento



Fuente
Sin Información

Muestra la fuente de financiamiento declarada en la publicación.

Agradecimientos



Agradecimiento
Sin Información

Muestra la fuente de financiamiento declarada en la publicación.