Muestra métricas de impacto externas asociadas a la publicación. Para mayor detalle:
| Indexado |
|
||
| DOI | 10.19255/JMPM01305 | ||
| Año | 2017 | ||
| Tipo |
Citas Totales
Autores Afiliación Chile
Instituciones Chile
% Participación
Internacional
Autores
Afiliación Extranjera
Instituciones
Extranjeras
This paper presents a method for determining and controlling variables which are critical to the desired duration of a project. The proposed method consists of four stages: 1) a Monte Carlo simulation of project scheduling using a dependency structure matrix (DSM), 2) the reduction of the number of input variables using an index based on the standardized regression coefficient, 3) the determination and regionalization of critical variables using a modified Monte Carlo Filtering (mMCF) method, and 4) an evaluation of risk of the project duration under the regionalized conditions. The proposed method was applied to three case studies. Results show that the method could be helpful in scheduling projects to obtain the desired duration under uncertainty, identifying critical variables, and regionalizing the critical input variables.
| Ord. | Autor | Género | Institución - País |
|---|---|---|---|
| 1 | GALVEZ-AHUMADA, EDELMIRA DELFINA | Mujer |
Universidad Católica del Norte - Chile
|
| 2 | Ordieres, Joaquin B. | - |
Universidad Politécnica de Madrid - España
|
| 3 | Capuz-Rizo, Salvador F. | Hombre |
Universitat Politècnica de València - España
|