Muestra métricas de impacto externas asociadas a la publicación. Para mayor detalle:
| Indexado |
|
||||
| DOI | 10.1016/J.COR.2019.02.001 | ||||
| Año | 2020 | ||||
| Tipo | artículo de investigación |
Citas Totales
Autores Afiliación Chile
Instituciones Chile
% Participación
Internacional
Autores
Afiliación Extranjera
Instituciones
Extranjeras
We adapt an existing integer-linear program to an operational polymetallic (gold and copper) open pit mine, in which the stockpile is used to blend materials based on multiple block characteristics, and call it ((P) over cap (la)). We observe that the linear programming relaxation of our objective function is unimodal for different grade combinations (metals and contaminants) in the stockpile, which allows us to search systematically for an optimal grade combination while exploiting the linear structure of our optimization model. We compare the schedule of ((P) over cap (la)) with that produced by (P-ns) which does not consider stockpiling, and with ((P) over tilde (la)), which controls only the metal content in the stockpile and ignores the contaminant level at the mill and in the stockpile. Our proposed solution technique provides schedules for large instances in a few seconds up to a few minutes with significantly different stockpiling and material flow strategies depending on the model. We show that our model improves the NPV of the project while satisfying operational constraints. (C) 2019 Elsevier Ltd. All rights reserved.
| Ord. | Autor | Género | Institución - País |
|---|---|---|---|
| 1 | Rezakhah, Mojtaba | Hombre |
Tarbiat Modares Univ - Iran
Tarbiat Modares University - Iran |
| 2 | MORENO-ARAYA, EDUARDO ENRIQUE | Hombre |
Universidad Adolfo Ibáñez - Chile
|
| 3 | Newman, Alexandra | Mujer |
COLORADO SCH MINES - Estados Unidos
Colorado School of Mines - Estados Unidos |
| Fuente |
|---|
| Comisión Nacional de Investigación Científica y Tecnológica |
| Consejo Nacional de Innovacion, Ciencia y Tecnologia |
| Conicyt grant PIA Anillo |