Muestra métricas de impacto externas asociadas a la publicación. Para mayor detalle:
| Indexado |
|
||||
| DOI | 10.1080/09537287.2019.1578905 | ||||
| Año | 2019 | ||||
| Tipo | artículo de investigación |
Citas Totales
Autores Afiliación Chile
Instituciones Chile
% Participación
Internacional
Autores
Afiliación Extranjera
Instituciones
Extranjeras
In a construction project, the production planning and control' function drives the deployment of construction operations. A reliable function is therefore essential. Currently, this function is supplied using economic/contractual and production processes. This approach, however, disregards the explicit regulation of teams, meetings, and the linkages between the function's elements. Using Lean Management and Complexity theories, we studied a mechanism to address this issue. Using data from an 18-storey building construction project in a case study, this paper analyses a prototype system for driving the function using their linkages. A questionable behaviour beyond the function's capability was found. This behaviour involves complex, flexible, and push features, focused on execution, where the linkages driven by teams, meetings and processes cause variation from 10% up to 54% in the failure reasons, the progress, and the reliability. These findings suggest a function driven by its complexity level. These new insights require further study.
| Ord. | Autor | Género | Institución - País |
|---|---|---|---|
| 1 | Zegarra, Omar | Hombre |
Pontificia Universidad Católica de Chile - Chile
|
| 2 | ALARCON-CARDENAS, LUIS FERNANDO | Hombre |
Pontificia Universidad Católica de Chile - Chile
|